Wind farm data tower under construction

YARMOUTHPORT - Court challenges having been defeated, the construction of a wind farm data tower 11 miles south of Cape Cod in Nantucket Sound is about to begin. The $2 million, 197-foot-tall tower will be assembled on a large barge that arrived at the site early Monday morning. The tower will be positioned on Horseshoe Shoal, where Cape Wind Associates hopes to build a 170-turbine offshore wind farm, the first ever in the nation.


Read the full story in the Cape Cod Times